On-demand PD in the Works
Imagine PD without space-eating boxes full of heavy, fluid-filled bags! Baxter has received FDA guidance on technology for the Amia cycler to produce on-demand sterile PD fluid using an integrated water filtration device. Patient testing is slated to begin in 2018.
Read the full article » | Posted 06-12-2017
Related Articles
- Byonyks on the Move: X-2 and X-3 APD Devices in Development Posted 07-16-2026
- Dr. Ben Reynolds and the Virtual Reality Kidney Dialysis Training Project Posted 06-17-2026
- HollyTM Implantable Continuous Dialysis System Could be Ready for Human Trials Soon Posted 04-14-2026
- Xeltis is Trialing its Polymer-based Vascular Access Posted 03-12-2026

